We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 different branches. For more particulars: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Scorching offering construction hydraulic jack up concrete putting increase in china
Tower Column hydraulic jack-up concrete inserting boom, Self-climbing variety, climbing by floor body or by shaft frame. Mostly utilized for concrete putting of development project, such as civil building, plant construction, bridge development, beam lawn, nuclear electrical power plant, infrastructure, etc.
Charactics
Modular design and style, mechanical and electrical integration management, folding boom, tube column, flooring frame and shaft frame. Integration of superior characteristics and merchandise diversification, to obtain a higher item portfolio, enhance the applicability of the merchandise.
Imported hydraulic and electrical parts, undertake high quality fa EPT coupling for hydraulic pipelines, which is transformed quickly, it can effectively fix the problem of oil leakage in the method of assembling and dismantling, and steer clear of the pollution of the surroundings. Safety and reliability
sections R type hydraulic growth, large circular arc, novel and gorgeous appearance, compact composition, and the light-weight design of the growth, which decreased the bodyweight of the whole equipment..
Easy to transport and put in.
Geared up with self-climbing frames which are pushed by hydraulic and which climb up automatically from the current ground to the preferred ground together the holes to begin with prepared in elevator nicely, the putting booms rise with the increasing flooring, conserving time and labor.
Attributes
A.Boom
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT technique
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Internal EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing System and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wi-fi Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electrical Control System
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Choice:
u Inner-climbing frames: Floor frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio distant Management: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Positioning increase Requirements:
Model | Units | HGY29C | ||
Performance | Max.radius of putting growth | m | 28.9 | |
Freestanding height (to the joint among the conclude of the growth and swivel table) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total excess weight | kg | 19100 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-four | |
Power | kW | 11 | ||
EPT system |
Pressure | MPa | thirty | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
Circumstance temperature 5ºC-35ºC | / | L-HM forty six | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control manner |
/ | Quick-haul Control /radio remote control | ||
Pipeline cleansing | / | Soaked cleansing/Dry cleansing |
||
Structure of tower body | / | Tubular column | ||
Section of tower entire body | m×m | .75×0.75 | ||
Boom |
Shape | / | 3 hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT section | Length | m | eleven.5 | |
Articulation | ° | 0°~eighty two.5° | ||
2nd part | Size | m | nine.three | |
Articulation | ° | 0°~180° | ||
3rd area | Size | m | 8.1 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing method | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .fifty two | ||
Floor body | / | Gap geared up in ground |
||
Shaft body | m | Hole well prepared in flooring 2.~2.7 |
||
Min.Interval of climbing frame | Climbing | m | three. | |
Inserting concrete | m | six. | ||
Rest | m | 6.0 |
29m Putting BoomWorking Variety :
33m Tower Jack-up Concrete Positioning increase Specifications:
Model | Units | HGY33E | ||
Performance | Max.radius of inserting increase | m | 33 | |
Freestanding top (to the joint amongst the finish of the growth and swivel desk) | m | 22.seven | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | constantly shut | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total bodyweight | kg | 21200 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-four | |
Power | kW | fifteen | ||
EPT system |
Pressure | MPa | 30 | |
Flux | l/min | eighteen | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Brief-haul Manage /radio remote management | ||
Pipeline cleaning | / | Damp cleansing/Dry cleansing |
||
Structure of tower entire body | / | Tubular column | ||
Section of tower physique | m×m | .75×0.75 | ||
Boom |
Shape | / | A few hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT part |
Duration | m | 12.38 | |
Articulation | ° | 0°~82.5° | ||
2nd area | Size | m | ten.ninety three | |
Articulation | ° | 0°~180° | ||
3rd segment |
Duration | m | 9.sixty nine | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing method | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .fifty two | ||
Floor body | / | Hole well prepared in floor | ||
Shaft body | m | Hole prepared in floor two.~2.seven |
||
Min.Interval of climbing body | Climbing | m | 3. | |
Inserting concrete | m | 6. | ||
Relaxation | m | 6.0 |
33m Placing BoomWorking Assortment :
Tower Column Concrete Putting Growth Installation:
Tower Putting Increase Job site Functionality:
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 distinct branches. For much more particulars: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of first products manufacturer’s (OEM) part quantities or emblems , e.g. CASE® and John Deere® are for reference functions only and for indicating item use and compatibility. Our firm and the detailed substitute components contained herein are not sponsored, approved, or created by the OEM.